U.S. Department of Transportation, Federal Highway Administration
Congestion Relief Program
Key facts
- Open now
- 1 grant
- Type of help
- Grant
Open now
- Fiscal Years 2025 and 2026 Congestion Relief Program · Due Dec 17, 2026 · 25 days left
What it pays for
The goals of the program are to reduce highway congestion, reduce economic and environmental costs associated with that congestion, including transportation emissions, and optimize existing highway capacity and usage of highway and transit systems through: (1) improving intermodal integration with highways, highway operations, and highway performance; (2) reducing or shifting highway users to off- peak travel times or to nonhighway travel modes during peak travel times; and (3) pricing of, or based on, as applicable, parking; use of roadways, including in designated geographic zones; or congestion.
This Assistance Listing 20.269 created in August 2025 was included in the previous ALN 20.205, please refer to former ALN 20.205 for FY24 and FY25 financial obligations. The new Assistance Listing 20.269 will be utilized by DOT at the start of FY 2026.
Who can apply
A state, Metropolitan Planning Organization (MPO), city, or municipality carrying out a project in an urbanized area with a population greater than 1,000,000. [� 11404; 23 U.S.C 129(d)(1)(A)]
How applications are judged
Varies by project. FHWA determines criteria for selecting proposals based on the stated objectives of the funding opportunity.
Match
None required (federal program listing).