← Back to search

Naval Supply Systems Command · Department of Defense

Research Initiatives at the Naval Postgraduate School

Open

Key facts

Deadline
Due Jan 13, 2030 · 1193 days left
Award size
Not stated: see the official notice
Total available
$20M · about 30 awards
Match ?
Not required · Work out your budget and match
Who can apply
Public college or university, Nonprofit with 501(c)(3), Private college or university
Where
Anywhere in the U.S., including Tennessee

How this fits you

  • Available in Tennessee (nationwide program)
  • No match required
  • Past Tennessee awards on file: 51

Tell us who you are to see whether you're eligible.

View on Grants.gov Add deadline to my calendar

About this grant

This FOA is intended for proposals related to basic and applied research in the STEM categories, and not related to the development of a specific system or hardware procurement. The proposal submission process has two stages: I. Applicants are encouraged to submit a white paper first to Grants@NPS.edu, ; and II. Applicants must submit a full proposal through Grants.gov (do not submit white papers through Grants.gov, only full proposals) Applicants are encouraged to submit a White Paper in advance of a Full Proposal to minimize the labor and other costs associated with the production of detailed full proposals that have little chance of being selected for funding. Based on an assessment of the white papers, the responsible Research Program Officer will provide informal feedback notification to the prospective awardees to encourage or discourage submission proposals. The Research Program Officer may also, on occasion, provide feedback encouraging re-work to strengthen a proposal. White Papers may be submitted at any time during the open period of this FOA. A separate White Paper is required for each research proposal.

Ask a partner for a letter

Your schedule, working back from the deadline

  1. Oct8
    Check that your SAM.gov registration is active (or start it now)
    Grants.gov: allow up to 10 business days for SAM registration, weeks or months if information isn't verified. It must be renewed every year. Grants.gov
  2. Dec23
    Ask partners for letters of support or commitment
    Suggested: partners need about three weeks to write and sign letters.
  3. Jan7
    Finish a complete draft for a final review
    Suggested: leave about a week for someone else to read the draft.
  4. Jan11
    Submit
    Grants.gov: submit at least 24–48 hours before the deadline: uploads fail, systems slow down, errors need fixing. Grants.gov blog
  5. Jan13
    Deadline
    From the funder.

Save this grant to put these dates in My grants and your private calendar.

What the official notice requires

Pulled from the official notice N00244-26-S-NPS-F001.pdf (42 pages) so you can see the requirements at a glance. Each item shows the notice's own words. Open the page to read it in context.

Award size and project length

  • Award amounts here are per year · p. 39
    “Recipients that have Federal contracts, grants, and cooperative agreement awards with a cumulative total value greater than $10,000,000 must disclose semiannually any information about the criminal, civil, and administrative proceedings. 5.” Open page 39

Registrations you need first (2)

  • Grants.gov · p. 8
    “Address to Request (Access) Application Package - This FOA may be accessed at Grants.gov (www.grants.gov).” Open page 8
  • SAM.gov, Unique Entity ID (UEI) · p. 24
    “Unique Entity Identifier and System for Award Management (SAM) - All applicants submitting proposals or applications must: a.” Open page 24

Registration is free but can take weeks, so start now, not when the deadline is close. Get-ready checklist

What to submit

  • Form SF-424 · p. 11
    “Mandatory SF-424 Research and Related (R&R) Family Forms The mandatory forms are found at https://www.grants.gov/web/grants/forms.html (1) SF-424 (R&R) The SF-424 (R&R) form must be used as the cover page for all proposals.” Open page 11
  • Project abstract or summary · p. 12
    “The project summary/abstract must identify the research problem and objectives, technical approaches, anticipated outcome of the research, if successful, and impact on DoD capabilities.” Open page 12
  • Timeline or schedule of completion · p. 13
    “Thus, full proposals must include a severable, stand-alone work plan without any proprietary restrictions or controlled unclassified information.” Open page 13
  • Resumes or bios of key staff · p. 16
    “Include curriculum vitae of the Principal Investigator and key co- investigators.” Open page 16
  • Budget narrative / justification · p. 18
    “The Budget Justification, which is a narrative explaining and justifying the budget figures in detail, must include all figures, calculations, and supporting documentation for” Open page 18
  • Form SF-LLL · p. 42
    “Disclosure of Lobbying Activities (SF-LLL) [V2.0] R & R Subaward Budget Attachment(s) Form [V3.0] NOTE:” Open page 42

Length limits

  • Page limit (see quote): 40 pages max · p. 11
    “The following components are excluded from the 40-page limit:” Open page 11

Formatting rules

  • double-spaced · p. 9
    “Spacing – single or double-spaced” Open page 9
  • 12-point font · p. 9
    “Font – Times New Roman, 12 point” Open page 9
  • single-spaced · p. 11
    “Spacing – single spaced” Open page 11

Mistakes that get applications rejected (5)

  • Over the length limit: White papers exceeding the page limit will not be evaluated · p. 9
    “White papers exceeding the page limit will not be evaluated” Open page 9
  • Could get your application rejected: The demographic information may be accessible to the reviewer, but will not be considered in the evaluation. · p. 24
    “The demographic information may be accessible to the reviewer, but will not be considered in the evaluation.” Open page 24
  • Could get your application rejected: Requests for more than one hundred-eighty (180) days pre-award costs will not be considered. · p. 25
    “Requests for more than one hundred-eighty (180) days pre-award costs will not be considered.” Open page 25
  • Sent the wrong way or format: Proposals with attachments submitted in word processing, spreadsheet, or any format other than Adobe... · p. 26
    “Proposals with attachments submitted in word processing, spreadsheet, or any format other than Adobe Portable Document Format will not be considered for award.” Open page 26
  • Could get your application rejected: Evaluation Proposals will not be evaluated against each other since they are not submitted in accordance... · p. 29
    “Evaluation Proposals will not be evaluated against each other since they are not submitted in accordance with a common work statement.” Open page 29

Who in Tennessee has won this program

28 awards to Tennessee groups in 4 counties since 2018. Largest shown:

Past Tennessee winners
Past winnerWhereAmountFiscal year
University of TennesseeKnoxville, Knox County$7.4M2018
University of TennesseeKnoxville, Knox County$5.2M2025
Vanderbilt UniversityNashville, Davidson County$5M2023
Collaborative Composite Solutions CorporationKnoxville, Knox County$5M2020
State of TennesseeNashville$4.9M spent that year2025
Vanderbilt UniversityNashville$2.6M spent that year2025
University of MemphisMemphis, Shelby County$2.2M2023
University of TennesseeKnoxville, Knox County$1.6M2020
Vanderbilt UniversityNashville, Davidson County$1.2M2021
Tennessee State UniversityNashville, Davidson County$1.2M2024
University of TennesseeKnoxville, Knox County$1.1M2021
Vanderbilt University Medical CenterNashville, Davidson County$849K2022

Source: USAspending.gov, Federal Audit Clearinghouse. Past awards show who this program funds. They don't guarantee future awards.

Tennessee groups that got this money through a state agency or another organization

This federal money also reaches local groups as pass-through grants. 23 pass-through grants on file. Largest shown:

Tennessee pass-through grant winners
Past winnerWhereThroughAmountFiscal year
Collaborative Composite Solutions CorporationKnoxville, Knox CountyOffice of Naval Research$2M spent that year2024
State of TennesseeNashvilleCollaborative Composite Solutions Corporation$732K spent that year2024
University of TennesseeChattanooga, Hamilton CountyGeorgia Tech Research Corporation$630K2024
Vanderbilt UniversityNashvillePrecise Systems, Inc$509K spent that year2023
State of TennesseeNashvilleOregon State University$397K spent that year2023
Vanderbilt UniversityNashville, Davidson CountyThe Pennsylvania State University$291K2026
University of MemphisMemphis, Shelby CountyVirginia Polytechnic Institute & State University$263K2026
Vanderbilt UniversityNashville, Davidson CountyRegents of the University of Minnesota$199K2026
State of TennesseeNashvilleGeorgia Institute of Technology$197K spent that year2025
State of TennesseeNashvilleStrategic Ohio Council for Higher Education$195K spent that year2024
Vanderbilt UniversityNashville, Davidson CountyThe Pennsylvania State University$194K2025
University of TennesseeKnoxville, Knox CountyUniversity of Kentucky Research Foundation, the$126K2026

Source: USAspending.gov pass-through reports (the first recipient reports each one of $30,000 or more).

About the federal program

Basic and Applied Scientific Research
Program number 12.300 (the federal Assistance Listing number) · U.S. Department of Defense, ONR · Cooperative agreement (a grant with close agency involvement), project grant

How applications are judged

Award decisions will be based on a competitive selection of proposals resulting from a scientific and cost review. Evaluations will typically be conducted using the following evaluation criteria: 1. Overall scientific and technical merits of the proposal; 2. Potential Naval relevance and contributions of the effort to the agency's specific mission; 3. The offeror's capabilities, related experience, facilities, techniques or unique combinations of these which are integral factors for achieving the proposal objectives; 4. The qualifications, capabilities and experience of the proposed Principal Investigator (PI), team leader and key personnel who are critical in achieving the proposal objectives; and 5. The realism of the proposed costs and availability of funds.

Match

None required (federal program listing).

Examples of funded projects

Fiscal year 2018: Properties and Performance of Compositionally Complex AlCrFeMn Alloys for Marine Applications Fiscal year 2019: Generalized Computations for Learning, Memory, and Decision Making in Artificial and Biological Neural Networks Fiscal year 2021: 100 drifting wave buoys were deployed in the Southern Ocean. Storms in the Southern Ocean generate energetic waves that radiate across the Pacific, Atlantic , and Indian ocean. Progress in ocean Internet of Things (IoT) technology enables the grantee to collect unprecedented data densities, which directly improves ocean and wave theories, validate and constrain ocean and atmospheric models, and provide a ground truth for satellite remote sensing data. The technology deployed by the grantee was developed with ONR sponsorship. It represents a shift in global ocean sensing toward a distributed paradigm with massive arrays of low-cost internet-connected nodes. Fiscal year 2025: Data Fusion and Assimilation for Multiscale 3D Velocity and Wall Stress Reconstructions in a Tip Gap Flow. The overarching goal of the proposed work is to advance knowledge of flow physics and cavitation inception in tip gap flow fields through the...

This program on SAM.gov

Something wrong on this page? Tell us
What's wrong?

Source: Federal grants from Grants.gov · the official federal record. Last checked by GrantMe Oct 8, 2026.

Reference numbers: official notice number N00244-26-S-NPS-F001 · program number 12.300