← Back to search

National Energy Technology Laboratory · Department of Energy

Annual Recurring University Training and Research

Open · Opportunity DE-FOA-0003215 · Assistance Listing 81.089

Key facts

Deadline
Due Oct 16, 2026 · 9 days left
Award size
Up to $750K
Total available
$10.8M · about 15 awards
Cost share / match ?
Not required · Work out your budget and match
Who can apply
Private college or university, Public college or university
Where
Anywhere in the U.S., including Tennessee

Before you apply: federal grants require an active SAM.gov registration (Unique Entity ID) and a Grants.gov account. The deadline is in 9 days. If your registration isn't already active, it may not be ready in time, so check it today. Grant-ready checklist

How this fits you

  • Available in Tennessee (nationwide program)
  • No cost share required
  • Only 9 days left to apply
  • Past Tennessee awards on file: 30

Tell us who you are to see whether you're eligible.

More from National Energy Technology Laboratory

Read the official notice View on Grants.gov Add deadline to my calendar Sign in to save

About this grant

Annual Recurring University Training and ResearchThe purpose of this funding opportunity is to solicit and award research and development grants to educate and train the next generation of engineers and scientists; to support novel, early-stage research at U.S. colleges and universities; to increase research and development opportunities for underrepresented and structurally marginalized communities; and to ensure that students are equipped with cutting-edge, translatable skillsets that allow them to contribute to the U.S. workforce and greater economy over the course of a longstanding and enduring career.

Should we apply? (2-minute check) Ask a partner for a letter

Your schedule, working back from the deadline

  1. Oct7
    Check that your SAM.gov registration is active (or start it now)
    Grants.gov: allow up to 10 business days for SAM registration, weeks or months if information isn't verified. It must be renewed every year. Grants.gov
  2. Sep25
    Ask partners for letters of support or commitment (already past: do it now)
    Suggested: partners need time to write and sign letters.
  3. Oct9
    Finish a complete draft for a final review
    University grant offices require final versions about 5 business days before the sponsor deadline. Emory Office of Sponsored Programs
  4. Oct14
    Submit
    Grants.gov: submit at least 24–48 hours before the deadline: uploads fail, systems slow down, errors need fixing. Grants.gov blog
  5. Oct16
    Deadline
    From the funder.

Save this grant to put these dates in your tracker and private calendar.

What the official notice requires

Pulled from the funding notice FundOpp_DE-FOA-0003215.pdf (43 pages) so you can see the requirements at a glance. Each item shows the notice's own words; open the page to read it in context. The notice itself always controls.

Award size and project length

  • Project period: 3 years · p. 5
    “Ap ril 2029 E stimated Period of Performance: 3 years from project start” Open page 5
  • Project period: 36 months · p. 6
    “Approximate award project period: 36 months” Open page 6

Registrations you need first

  • Login.gov · p. 30
    “To log in, click More Options, Login.gov, then sign in 3.” Open page 30

New to these? SAM.gov registration can take weeks, so start early: grant-ready checklist.

Steps before the deadline

  • Letter of intent · p. 6
    “Applicants must submit a Letter of Intent by 5:00 pm E.T. on the due date listed above to be eligible to submit a Full Application for each Application Submission Period.” Open page 6
  • Letter of intent · p. 20
    “Application Submission Phase Eligibility for Submission Letter of Intent Must be submitted by the specified due date and time to be eligible to submit an application.” Open page 20
  • Letter of intent · p. 20
    “Letter of Intent You must submit a letter of intent by the specified due date and time to be eligible to submit an application.” Open page 20
  • Letter of intent · p. 21
    “You must provide the following information in your letter of intent.” Open page 21

What to submit

  • Letters of support or commitment · p. 17
    “Program Description All applications must include a letter of commitment from at least one partnering organization.” Open page 17
  • Project abstract or summary · p. 21
    “The letter of intent must have an abstract, which should be a short explanation of the proposed project.” Open page 21
  • Resumes or bios of key staff · p. 23
    “When you submit a current and pending support disclosure and biographical sketch (biosketch) or resume for a person, you are acknowledging that DOE designates that person as a Covered Individual.” Open page 23

Length limits

  • You: 6,000 characters max · p. 21
    “You will enter the abstract in eXCHANGE, so it cannot exceed 6,000 characters.” Open page 21
  • DESCRIPTION Cover Page Included: 1 page max · p. 28
    “SECTION MAXIMUM PAGE LIMIT* (if applicable) DESCRIPTION Cover Page Included in the page limitation (1-page maximum) The cover page must include all the following:” Open page 28

How applications are scored

Build your narrative outline from these criteria

  • Scientific and Technological Merit: 25% · p. 37
    “Scientific and Technological Merit (25%) 1.” Open page 37
  • Technical Approach and Understanding: 25% · p. 37
    “Technical Approach and Understanding (25%) 1.” Open page 37
  • Strengthening the Energy Workforce: 30% · p. 37
    “Strengthening the Energy Workforce (30%) 1.” Open page 37
  • Technical and Management Capabilities: 20% · p. 38
    “Technical and Management Capabilities (20%) 1.” Open page 38

Cost share or match

  • Cost share / match · p. 6
    “Minimum non-Federal share required: 0% of the total project costs” Open page 6
  • Cost share / match · p. 11
    “Cost Share Requirements Cost sharing is not required under this NOFO for prime or subrecipients.” Open page 11

Dates in the notice

  • May 15, 2028 · p. 5
    “May 15, 2028 L etter of Intent Deadline: 1.” Open page 5
  • July 25, 2028 · p. 5
    “July 25, 2028 A pplication Submission Deadline: 1.” Open page 5
  • October 16, 2026 · p. 6
    “Funding Details Single Topic Area Submission Deadline One (October 16, 2026):” Open page 6

Mistakes that get applications rejected

  • Could get your application rejected · p. 6
    “Failure to submit a Letter of Intent by the date and time listed for the submission period automatically disqualifies a potential applicant from being considered for that submission period.” Open page 6
  • Could get your application rejected · p. 15
    “Applications that do not align with a priority initiative listed within one of the following three subtopics will be considered non-responsive and will not be reviewed or considered for selection. 1.3.1.” Open page 15

Who in Tennessee has won this program

12 awards to Tennessee recipients in 4 counties since 2017. Largest shown:

Past Tennessee recipients
RecipientWhereAmountFY
Collaborative Composite Solutions CorporationKnoxville, Knox County$2.1M2021
Applied Thermal Coatings, Inc.Chattanooga, Hamilton County$1.8M2020
Skynano LlcKnoxville, Knox County$1.8M2021
Holocene Climate CorporationKnoxville, Knox County$1.5M2024
Tennessee Technological UniversityCookeville, Putnam County$1M2023
We New Energy, Inc.Farragut, Knox County$997K2021
Tennessee State UniversityNashville, Davidson County$800K2024
Tennessee Technological UniversityCookeville, Putnam County$780K2020
University Of TennesseeKnoxville, Knox County$524K2026
University Of TennesseeKnoxville, Knox County$425K2021
University Of TennesseeKnoxville, Knox County$400K2024
Tennessee Technological UniversityCookeville, Putnam County$368K2018

Source: USAspending.gov. Past awards show who this program funds; they don't guarantee future awards.

Tennessee groups that got this money through a state agency or another grantee

This federal money also reaches local groups as subawards. 18 subawards on file. Largest shown:

Tennessee subaward recipients
RecipientWhereThroughAmountFY
Ut-Battelle LlcOak RidgeWest Virginia University Research Corporation$1.3M2023
Vanderbilt UniversityNashville, Davidson CountyUniversity of Kentucky Research Foundation, the$1.2M2023
Ut-Battelle LlcOak Ridge, Anderson CountyHolocene Climate Corporation$675K2024
University Of TennesseeKnoxville, Knox CountyUniversity of Alabama$427K2024
Ut-Battelle LlcOak Ridge, Anderson CountyCollaborative Composite Solutions Corp$339K2024
Ut-Battelle LlcOak Ridge, Anderson CountyCollaborative Composite Solutions Corp$170K2023
Ut-Battelle LlcOak RidgeWest Virginia University Research Corporation$150K2024
Ut-Battelle LlcOak Ridge, Anderson CountyUniversity of Tennessee$125K2024
Electric Power Research Institute IncKnoxville, Knox CountyUniversity of Kentucky Research Foundation, the$124K2025
Tennessee State UniversityNashville, Davidson CountyTennessee Technological University$102K2025
Vanderbilt UniversityNashville, Davidson CountyUniversity of Kentucky Research Foundation, the$100K2024
Tennessee State UniversityNashville, Davidson CountyTennessee Technological University$98K2023

Source: USAspending.gov subaward reports (prime recipients report subawards of $30,000 or more).

About the program (81.089)

Fossil Energy Research and Development — Hydrocarbons and Geothermal Energy Office (HGEO)

How applications are judged

Criteria varies according to the specific notice of funding opportunity. Typically, the selection criteria includes criteria related to merit of the technical work proposed, the reasonableness and thoroughness of the technical approach, program policy factors, the quality of the technical capabilities, facilities and personnel involved in the scope of work, availability of funds, and the thoroughness of the project management plan.

Matching requirements

This program has no statutory formula. Matching Requirements: Percent: Other As Specified under Section 988 of the Energy Policy Act of 2005 and EISA, with exceptions, a minimum of 20% cost share is required for research and development. A minimum of 50% is required for demonstration. Higher cost share may be requested. For education and outreach projects, the statuatory cost share is 0%.MOE requirements are not applicable to this assistance listing.

Examples of funded projects

Fiscal Year2025: Advanced Energy Systems, Advanced Production Technologies, Carbon Transport and Storage; Mineral Sustainability; Enhanced Oil Recovery; Carbon Capture; University Training and Research; and Advanced Remediation Technologies.Fiscal Year2026: Advanced Energy Systems; Transport and Storage; Conversion and Value-Added Product; Point-Source Capture; Advanced Production Technologies; Natural Gas Infrastructure and Hydrogen Technologies, Mineral Production and Processing Technologies; and University Training and Research

Program listing on SAM.gov

Something wrong with this listing? Tell us
What's wrong?